Prepare for Tile Installation

The next step will be to prepare the ICF walls for tile installation.

Leveling boards can be used to prepare the pool walls for tile installation. Small adjustments can be made to the coping if the wall heights are not uniform.

Step 21: To prepare for tile, leveling boards can be installed. If wall heights are not uniform, slight adjustments to the coping can be made at this time.