Step 5: Pour and Level Footings

Pour the footings, consolidate concrete as necessary and level the footings to prepare for stacking. Pouring pool footings is done the same way that you would any structure. Ensure that concrete is properly consolidated, level, and that aggregate is distributed throughout the mix.

Step 5: Pour your footings, consolidate concrete as necessary. Screed and level footings to create a level surface for stacking block.