Step 3: Pour Footings

A pre-pour inspection may be required so check with local code officials. Place concrete in formwork. Care should be taken when consolidating concrete to eliminate voids or honeycombing.

Step 3: A pre-pour inspection may be required, check with local code officials. Place concrete in formwork. Care should be taken when consolidating concrete to eliminate voids or honeycombing.
Step 3: A pre-pour inspection may be required, check with local code officials. Place concrete in formwork. Care should be taken when consolidating cocnrete to eliminate voids or honeycombing.