Basic ICF Installation Setting the First Few Courses Setting the First Few Courses Quiz

This quiz will cover some of the basic material presented in the Setting The First Few Courses lesson. Please answer the questions below. After completing the quiz you may mark this lesson complete and continue on to the next lesson.

Note: All quizzes in this course require an 80% passing grade to continue to the next lesson. If you do not meet the required score, click the “View Questions” button to see which questions were answered incorrectly and then click “Restart Quiz” to try again. 

Good luck!


Before stacking, where should all necessary materials be staged?
Why should material be stored at least 6 feet away from the future wall?
Where should you begin stacking ICF blocks?
How should each new course begin?
Where is it recommended that left over cut blocks be placed?
What is required for a cut block to be to be integrated into the wall?
What does it mean to "Shim and Trim"?
How much spray foam should be applied after shimming and trimming?
If you’re only stacking a few courses and then pouring the inside of a basement, which materials should be staged inside the jobsite?
You can pre-mark openings on the face of the ICF block.