Basic ICF Installation Post Pour Concrete Inspection Post Pour Concrete Inspection Quiz

The Post Pour Concrete Inspection quiz will cover some of the basic material presented in this lesson. Please answer the questions below. After completing the quiz you may mark this lesson complete and continue on to the next lesson.

Note: All quizzes in this course require an 80% passing grade to continue to the next lesson. If you do not meet the required score, click the “View Questions” button to see which questions were answered incorrectly and then click “Restart Quiz” to try again. 

Good luck!


What is the process in which concrete is protected from loss of moisture and kept within a reasonable temperature range?
What is the result of concrete curing?
Cracks in concrete…
Curing is both a process as well as a measure of strength.
What is the 28 day stipulation?
According to the 28 day stipulation, concrete will reach what percent of its final design strength after 3 days?
According to the 28 day stipulation, how long will it take for concrete to reach 75% of its final design strength?
Concrete will grow even stronger after 28 days?
At what point should you brush spilled concrete off the walls, sweep, and clean the jobsite?
How long should vertical bracing be left in doors and windows?