Other Pouring Considerations
- In multi-story structures, stop pouring concrete 8” down inside the form. This prevents a seam from being created at the point a new course of block is added.
- Protect the top interlock with tape or a metal track if continuing up the wall with another story.
- Place vertical rebar in the top course as specified to sufficient height for lap requirements.